Match a coating progress payment to the work it covers
Use Diamond’s Anderson and Savannah field photographs to distinguish a repaired detail, a coating reading and completed surface coverage before releasing a bid milestone.
What the project shows
Working with Chandler Roofing in Anderson, South Carolina, Diamond documented the washed roof, treated seams and equipment curb, a flashed penetration and the finished surface. At a Savannah neurological facility, a separate project photograph shows a wet-film gauge in the coating. The photographs answer different questions. A close-up of a treated seam establishes where that detail was worked. A gauge photograph represents a reading at one location.

Agree on the evidence before approving the draw
- Match every payment milestone to a named roof section and a stage. If the line item covers all curb details in a zone, ask for an overview keyed to the curb list and dated close-ups for exceptions.
- For a coating milestone, agree in advance which product records and location-tagged readings the contract calls for. Have the reviewer flag missing locations while the crew can still identify them.
- Record open corrections separately from the quantity accepted. Name who reviews the record and attach the dated approval to the payment request.
Ask before approving the bid
Could someone who was absent from the site identify the area billed, the work completed and any details still open? Request the missing photograph, marked plan or measurement for that section before approval.