Diamond Roof Restorations · In the field

Roof coatings.
Restoration explained.

Understand what roof coatings do, compare their benefits, and learn whether your commercial roof is a candidate for restoration. A worn surface, a leaking fastener and wet insulation each call for a different response.

Diamond roof restoration footage.

Diamond Roof Restorations · 2 min 40 sec

Can your roof be restored?

Watch how surface preparation, seam repairs and coating layers work together on metal and flat roofs. See where maintenance and warranty options fit into the decision.

Request a roof inspection(912) 207-6273

Roof coatings explained

A new protective surface.
A roof worth keeping.

Roof coatings are liquid-applied materials that cure over a prepared, compatible roof. The complete restoration includes repairs and flashing details as well as the coating over the field of the roof.

Keep serviceable materials

An eligible roof can be restored while retaining sound portions of the existing assembly, reducing tear-off and disposal compared with full replacement.

Renew weather protection

Repair vulnerable details and apply a specified protective system across the prepared surface. The roof’s condition determines what must be repaired first.

Reflect more sunlight

A qualifying reflective finish can reduce heat absorbed by the roof. The effect on cooling bills depends on the building, insulation and climate.

Learn more: Roof Coatings Manufacturers Association and EPA’s cool-roof explanation.

What we look for on your roof

Where the water goes

A ceiling stain gives us a starting point. We trace the area back to roof seams, wall flashings, curbs and drains. If water stays on the roof after rain, the drainage problem belongs in the scope.

What can stay in place

We look for loose panels, corrosion and signs of moisture beneath the surface. An inspection or moisture survey can identify sections that need removal before restoration makes sense.

What will bond

The existing membrane, finish or old coating determines the preparation. An adhesion test on the actual roof helps establish whether the proposed primer and coating will hold.

Match the scope to the condition

Repair, restore, recover or replace?

Inspection findings guide the scope. Different sections of the same building may need different work.

Repair a defined problem

A localized leak or damaged detail may call for a targeted repair when the surrounding roof remains serviceable. Ask what the repair addresses and whether the rest of the roof needs further investigation.

Restore with a coating

Consider restoration when the existing assembly is sound enough to retain and its leaks, wet areas and failed details can be addressed. The selected system still needs drainage, adhesion and compatibility checks.

Recover with a new assembly

A new roof assembly may be installed over an eligible existing roof. Condition, moisture, weight, applicable code and the manufacturer’s requirements determine whether recovery is an option.

Replace the assembly

Extensive moisture, deterioration or repairs that no longer make practical sense can lead to replacement. Ask which layers need removal and how the new roof will address the underlying problems.

Compare the assessment criteria in GAF’s coating-versus-replacement guide. The written scope should identify the sections included in each approach.

Choose a system for the roof you have.

The existing surface, moisture below it, drainage and adhesion come first. Then compare the complete system: preparation, detail treatments, coating layers and the proposed warranty.

Acrylic systems

At TideWater Trailer Supply in Savannah, Diamond sealed the panel laps and fasteners before applying high-solids acrylic. For a proposed acrylic system, check that drainage, surface preparation and the application weather suit the selected product.

Explore acrylic coating benefits

See the TideWater scope

Urethane with silicone

American WeatherStar’s Ure-A-Sil combines urethane detail treatment and a urethane base with a silicone topcoat. Its substrate-specific guidelines define the system. Ask which assembly is proposed for your roof and which written warranty it can qualify for.

Explore urethane coating benefits

Explore the Ure-A-Sil system

The surface underneath changes the preparation.

Metal panels
Check corrosion, panel condition, seams, fasteners and the existing finish.
TPO, PVC or EPDM
Identify the membrane and review its specific cleaning, primer and adhesion requirements.
Modified bitumen or built-up roofing
Identify the surfacing. Smooth, granulated and loose-gravel roofs need different evaluations.
Spray polyurethane foam
Check the foam and the protective coating already on it before planning a recoat.
A previously coated roof
Identify the old coating and its condition. Compatibility and preparation determine what can go over it.

These are assessment questions, not an approval for a particular roof. See RCMA’s guidance on primers and existing surfaces and its roof coating FAQs.

From roof conditions to finished surface

What goes into a restoration

Aerial view of the Anderson roof before restoration
Existing conditions

Inspect the assembly

Identify the roof, trace leak areas and determine which moisture and adhesion checks are needed.

The washed Anderson roof with seams and rooftop equipment visible
After washing

Prepare and repair

Clean the surface and address wet or damaged areas, drainage and failed details before coating.

Treatment along roof seams and around an equipment curb in Anderson
Detail work before the topcoat

Build the specified system

Use the selected detail treatments and coating layers, with the preparation, rates and curing conditions in the specification.

The finished white coating across the Anderson roof
Finished surface

Check the work and close out

Ask how application will be verified and which records, care instructions and issued warranty documents will be provided.

Photographs: Diamond’s Anderson project with Chandler Roofing. These show the visible stages; application records and inspections establish details a photograph cannot confirm. See the complete project.

For system-specific preparation and application requirements, see GAF’s liquid-applied roofing manual (PDF).

Your roof. A visible record.

Know what happened
at every stage.

From the first finding to the final walkthrough, connect each recommendation to a roof location, a photograph and the work performed. The stages below follow the selected system for your building.

  1. BeforeMap the findings
  2. Wash & dryPrepare the surface
  3. RepairsAddress the defects
  4. Seams & detailsDocument the treatment
  5. BasecoatWhen the system calls for it
  6. Final coatRecord the application
  7. CloseoutReview the finished work
A handheld pull gauge used during a Diamond roof coating adhesion test See an adhesion test in the field

A small test. Useful evidence.

Confirm the bond before the coating.

A representative test patch helps evaluate how the proposed preparation, primer and coating bond to the existing surface. Record its location, curing conditions, result and where separation occurred.

Evaluate the result against the selected manufacturer’s requirements. Moisture, deck condition and drainage need their own checks.

See GAF’s adhesion-test guidance (PDF)
A walkthrough you can follow

The inspection video follows a clear sequence: where we are, what we found, why it matters, the proposed repair and how the work will be checked. Photos and marked roof areas keep that explanation connected to your property.

Progress before it is covered

Matching views show the roof before work, after cleaning, through repairs and detail treatments, and at completion. Recording work before the next layer goes on preserves details that a finished-roof photo cannot show.

Updates identify completed work, the next step and any decision or schedule change you need to know about.

A closeout package for your records
  • Inspection findings and the agreed scope
  • Repair and application photos linked to roof areas
  • The products and system actually installed
  • Approved changes and the remaining punch list, if any
  • Warranty issuance status and maintenance instructions

The proposal explains the documentation included. Warranty coverage follows the issued documents for your building.

Plan my roof assessment

Reflective protection, selected for your roof.

A reflective coating can lower the heat absorbed at the roof. A complete restoration also addresses the surface, repairs and flashing details that help the selected system perform.

Reflect sunlight. Reduce roof heat.A reflective surface helps keep solar heat out of the roof.
  1. Prepare the roofIdentify repairs, clean the surface and confirm compatibility with the coating system.
  2. Renew protectionAddress seams and penetrations, then apply the specified protective system.
  3. Reflect sunlightA qualifying reflective surface helps reduce roof heat. Cooling results depend on the building and climate.

Match the product to its published record

Compare the exact product, color and tested surface with the proposal. The linked records provide the complete technical data for each product.

Published product record

UNIFLEX® Silicone44™, 44-300

Bright white on a smooth surface · CRRC 0630-0025. Open the complete record to review the tested product and its published ratings.

View CRRC record 0630-0025
Published product record

American WeatherStar Acrylic 211

Bright white on a smooth surface · CRRC 0854-0001. Open the complete record to review the tested product and its published ratings.

View CRRC record 0854-0001

Looking for an ENERGY STAR® roof?

EPA retired ENERGY STAR certification for roof products on June 1, 2022. To compare today’s cool roofs, look up the exact product, color and surface in the Cool Roof Rating Council (CRRC) directory.

ENERGY STAR logo and title from EPA’s archived roof-products specification
EPA’s archived roof-products specification · Version 3.0

Roof coating coverage calculator

Check the quantity for one product and one coat. Use the roof area in your proposal and the application rate in the written system specification.

Example A 400 sq. ft. section at 1.5 gallons per 100 sq. ft. uses 6 gallons. That takes two whole five-gallon pails before material loss.

An orange-gloved hand presses a notched metal gauge into fresh white roof coating.
A wet-film gauge measures how thick the fresh coat is at this spot. The crew can compare that reading with the thickness specified for the coat.

Manufacturer-documented examples

What qualified restorations look like

Warner Robins, Georgia

122,800 sq. ft. metal restoration

American WeatherStar reports that a 25-year-old R-panel roof was cleaned, its fasteners and seams were detailed, and two acrylic coats were applied. The manufacturer’s case study lists a 10-year labor-and-material warranty.

Read the manufacturer case study
Elyria, Ohio

56,100 sq. ft. arena restoration

GAF reports that the project team compared replacement, TPO recovery and silicone restoration, then repaired damaged areas and detailed screw heads and seams before applying the silicone system. Building weight and operational constraints affected the decision.

Read the manufacturer case study

These are manufacturer-published project profiles, not Diamond projects or independent performance studies. Sizes, conditions and outcomes belong to the cited projects.

What should the assessment answer?

Give each roofer the same building address, leak history and access hours. Then ask:

  • Which sections can stay, and what findings could change that recommendation?
  • Which moisture, drainage and adhesion checks are needed?
  • What repairs and complete coating system are included?
  • What warranty is proposed, and what care and records would it require?

Compare bids with the two-proposal worksheet

Will a roof coating stop leaks?

A coating is not a shortcut for finding leaks. Existing leaks and failed details should be located, repaired and allowed to dry before the coating is applied. A moisture survey may be needed to define wet areas below the surface.

What changes the price?

Square footage is only the start. Ask the proposal to identify wet sections to remove, rust repairs, seams and penetrations to treat, the coating system and access equipment. On an occupied building, include loading docks and entrances that must stay open.

How long does a coating last?

Existing roof condition, the specified system, maintenance and exposure all matter. Ask for the proposed warranty term, who covers labor, what is excluded and which inspections must be documented. Use the written terms for your building when comparing offers.

What if part of the roof needs replacement?

Ask for a marked roof plan showing repair areas, sections suitable for coating and sections needing replacement. That gives you a basis for comparing phased work with a wider replacement.

Explore TPO replacement

After the project

Keep the roof’s records together.

Plan inspections, coordinate rooftop service work and keep the issued warranty with your maintenance history.

Read the coated-roof care guide

Diamond in the field

See a restoration from prep to finish

Real footage from our crew. Choose a film, then move through the gallery at your own pace.

Films labeled “Original audio” play with sound. The site music pauses while you watch. Hear our customers on the testimonials page.