Drainage
Have drains, gutters and scuppers checked for debris and blockages. Record areas where water remains so the cause can be evaluated.
A restored roof still needs attention. Keep its records together, plan inspections and coordinate the people who service equipment above your building.
At project closeout
Ask which records are included in your project’s closeout. Keep them where the next building manager, service contractor or owner can find them.
American WeatherStar’s scheduled maintenance checklist (PDF) provides inspection and recordkeeping forms. Use the guidance for your installed system.
Read who issues the warranty, what materials and labor it covers, its exclusions, and its inspection and claim-notice requirements. A sample helps you compare proposals; retain the document issued for your building.
Find American WeatherStar sample warrantiesRoutine attention
The Roof Coatings Manufacturers Association recommends inspections twice a year and after major storms or high winds. Confirm the schedule, documentation and contractor requirements in your own system’s care instructions and warranty.
Have drains, gutters and scuppers checked for debris and blockages. Record areas where water remains so the cause can be evaluated.
Have the contractor examine flashings, penetrations, roof edges and equipment connections for damage or deterioration.
Check for punctures, worn coating and damage near equipment. Repairs should use the materials and procedures approved for the installed system.
Sources: RCMA’s maintenance guidance and American WeatherStar’s inspection checklist (PDF).
Record the date, roof section, observations, photograph references, action taken and next check. Keep unresolved items visible until the repair is documented. Arrange roof access and inspection work with a qualified contractor.
HVAC, equipment and other trades
Before new equipment, penetrations or other alterations, ask the roofing contractor which details and manufacturer approvals are needed. Share the coating system’s name with the service crew.
Plan access routes and surface protection. Keep a log of rooftop visits, and have tools, debris and any resulting damage addressed before the service visit is closed out.
GAF’s care and preventive maintenance guidance (PDF) covers rooftop access, trade damage and alterations. The requirements for your own system govern the work.
Tell us the building address, where water appeared indoors, when it started and who can arrange access. Dated indoor photos and information about recent rooftop service work can help the investigation.
Check the issued warranty for the correct notice recipient and reporting deadline, and notify the manufacturer as required. Ask about approved temporary repairs before another product is applied to the roof.
Keep the report and repair history with your roof file. Review the applicable warranty terms.
Looking ahead
Before adding another coat, identify the existing coating and check its bond, the roof beneath it and the repairs needed. The old coating’s condition affects cleaning, primer and compatibility requirements.
Ask whether a repair, a compatible recoat or more extensive work is appropriate, and whether a separate warranty is available for that scope.
See RCMA’s guidance for previously coated roofs. Compare repair, restoration, recovery and replacement.
Planning your next roof project?
Compare repairs, system requirements, warranty coverage and owner records in one worksheet.