Document a metal panel transition before ordering matching parts

Use the Adel warehouse survey to build a request for a matching metal transition. Mark the overlap, existing profiles and dimensions the fabricator needs.

What the project shows

On an Adel warehouse roof, Diamond recorded a dimension at a raised metal detail. A second image shows an overlap where red and light-colored sheets meet. Together they establish where adjoining runs change. The record covers a survey. It contains neither a fabrication order nor a completed repair.

Tape measure held vertically against a raised roof detail
Recording a dimension at a raised section of the roof.

Build a detail sheet the fabricator can use

  1. Mark the transition on an overview and label the two panel runs. Keep the measured detail and its overview together so the supplier sees which direction the sheets run.
  2. Ask the field team to record rib spacing, height, lap direction and the length of the transition with units. Identify which dimensions have been verified on site and which require access under an existing piece.
  3. Before ordering, ask the fabricator for the proposed profile and the contractor for the tie-in detail. Have one project contact check the drawing against the field sheet and record the approved revision.

Ask before approving the bid

Does the price include measuring, drawing review, fabrication and installation? If opening one existing detail changes the dimensions, agree who can authorize the revised piece before metal is formed.