Diamond Roof Restorations · Exterior painting preparation

Commercial exterior painting

The original light finish was worn in patches along the loading side of the building. These photos follow that wall as the tan paint went on, from the base of the masonry to the roof edge.

Related Diamond footage: preparing an exterior wall before the next finish.

The side wall, before and after

Long light-colored masonry wall with patchy paint beside a commercial loading area
Before painting. The side wall shows scattered dark patches in the old finish.
The same long masonry wall with a continuous tan finish beside the tank and yellow posts
After painting. Follow the same wall from the tank toward the loading area.

Paint coverage in progress

Weathered white wall finish around the projecting equipment enclosure
The original finish around the equipment enclosure, seen from above.
Tan paint covering the lower part of a light-colored commercial wall
Work in progress. The tan finish reaches partway up the side wall.
Tan-painted side wall extending across the commercial building
The full side elevation after painting, including the enclosure on the left.
Tan-painted commercial wall and projecting enclosure from ground level
The painted wall and enclosure seen from the drive.

At the wall

A short field clip shows the crew working beside the lift, with the original jobsite audio. As the camera turns, the worn finish is visible on the masonry.

From the jobsite

Follow this project.

Read the original job updates from our team.

InstagramJobsite updateLinkedInJobsite update
Request a painting estimateExplore exterior servicesSave Diamond’s contact

Request an assessment

Tell us where the property is and what needs attention. Roof inspections and estimates are free, with measurements, photos, a video walkthrough and drone views included. You’ll receive a request reference number.

Add address, timing or project details (optional)