Diamond Roof Restorations · Exterior painting preparation
Commercial exterior painting
The original light finish was worn in patches along the loading side of the building. These photos follow that wall as the tan paint went on, from the base of the masonry to the roof edge.
Related Diamond footage: preparing an exterior wall before the next finish.
The side wall, before and after
Paint coverage in progress
At the wall
A short field clip shows the crew working beside the lift, with the original jobsite audio. As the camera turns, the worn finish is visible on the masonry.
From the jobsite
Follow this project.
Read the original job updates from our team.





