Occupied-building roof work handoff log
Keep a dated record of who controls each work area between an assessment visit, a tenant shift and the next crew. A warehouse manager can use it to track when a loading bay can reopen. A care facility can use it to keep the next shift informed about work over an occupied wing.
Your entries stay on this page. Print or save a PDF before closing, refreshing or opening another page.
Set the site coordination rules
Identify the facility lead and the contractor lead by role. Agree on the reporting channel before the visit. Use your own facilities system for sensitive access instructions.
Record each transfer of responsibility
Start a separate entry when a zone, responsible team or access window changes. During bidding, use the entry to record an unresolved access question. During work, record the condition reported by the outgoing team and who will verify it.
Handoff 1
Handoff 0