Charleston, SC · Roofing journal
Scope a roof project reached through a shared passage
For a Charleston storefront with a shared passage to the rear, access can set the sequence for the entire job. A bidder needs the opening dimensions and the hours the passage is available.
Show the route from street to work area
Photograph each turn and doorway along the ground-level approach. Mark which gate is locked, who can open it and when neighbors need the passage for deliveries. Ask the estimator to check whether the planned material lengths will fit.
Price the handling arrangement
Have the bid describe where the truck will unload, who moves material from there and when the shared route reopens. If an alternate delivery point is needed, confirm permission and the effect on labor before ordering.