Coffee County, GA · Roofing journal
Include old sign brackets in a reroof bid
Unused signs can leave brackets and connections at roof edges. A scope that only mentions the new roof can leave those details unresolved.
Make a bracket list
Use ground-level views and the contractor's inspection photos to number each bracket. Ask the owner which signs will stay, which are scheduled for removal and who owns the adjoining electrical work.
Define the finish at each location
Have the bid show the flashing work around retained brackets and the repair left after each removal. Request one labeled closeout photograph per location to keep with the sign records.