Order the roof curb and the equipment work together
When a Goose Creek facility replaces rooftop equipment, the unit dimensions, curb detail and installer schedules belong in the same work order.
Reconcile the equipment drawings
Have the mechanical contractor identify the existing unit, replacement model and proposed curb or adapter. Give that drawing to the roofer and ask for the work at the surrounding roof to be marked on it. Resolve differences before equipment is delivered.
Assign the handoff on installation day
Agree on who removes the old unit, who confirms the opening dimensions and who completes the roof detail. Ask each contractor to record the completed portion under the same unit identifier for the owner’s maintenance file.