Define the roof junction when a building gets an addition
For a Newnan commercial addition, the junction between the existing roof and new construction can sit between two contractors’ scopes. Give the junction an owner before comparing the bids.
Mark existing and proposed work on one drawing
Use the current site plan, building name and street address. Mark the existing roof edge, new roof elevation and intended drainage direction. Ask the estimator to identify the panel profile or membrane where the two areas will join and any existing drawings that still need field verification.
Ask for the work order at the connection
Request a sequence for opening, protecting and closing the junction, with the responsible trade at each step. Clarify how the contractor will document concealed work and what needs to be completed before the adjoining trade can proceed. Match the final bid and site access plan to the parcel identified in Newnan’s map resources.