Who owns the roof work at an equipment curb?
At a Rincon plant or workshop, one leak report can involve the membrane, the curb and equipment above it. Asking bidders to draw their scope boundary makes the handoff easier.
Put the unit identifier on the roof photo
Use the equipment name from the maintenance schedule and the room it serves. Have the inspector photograph the curb and the adjacent roof from a consistent direction. Ask which observations point to the roofing detail and whether a mechanical contractor needs to evaluate equipment or connections separately.
Price the handoff before scheduling a shutdown
Get each trade’s responsibilities and exclusions in writing. If equipment must be moved for access, ask who arranges that work and what downtime the facility should allow. Keep the before and after pictures under the same equipment identifier so future maintenance staff can find the detail.