Record roof-related exceptions at a tenant handback
Build a dated record of rooftop changes and unresolved questions while the outgoing tenant and building team are both available.
How to use this worksheet
Compare the move-in condition file with tenant improvement approvals and the outgoing party’s equipment list. Give each changed roof opening, support or piece of equipment its own identifier. Record the tenant’s account, the owner’s observation and the document supporting each entry. Ask the property manager to assign unresolved responsibility questions to the person who interprets the lease. Keep the physical inspection, proposed corrective work and responsibility decision separately dated so one is never mistaken for the other.
Example
A departing restaurant lists two exhaust fans for removal. The move-in photographs show one curb and the alterations file lists a second. At handback, both parties record the two locations and request the approved removal scope before assigning the work.
Your roof record
Type your notes, then print or save a PDF before leaving this page. Anyone opening a shared link gets a blank worksheet.