Commercial roof worksheets
Choose the decision in front of you. Fill in one worksheet for your building or download a meeting packet to share with your team.
18 worksheets
No worksheets match. Try another term or choose all categories.
Assessment evidence
Prepare the inspection and testing records a restoration decision depends on.
Assessment evidence packet (PDF)Identify the existing coating on each roof section
Give a restoration bidder traceable records for each surface they expect to coat.
Review an adhesion test report before approving coating
Tie every test result to the surface, preparation and proposed system it represents.
Read a roof moisture map before budgeting tear-out
Separate survey indications, field confirmations and measured repair quantities.
Verify drainage after an earlier roof repair
Decide which post-repair observations a new restoration scope must address.
Authorize hidden roof repair quantities before they grow
Give the field crew a workable approval process for deterioration uncovered during restoration.
Trace roof warranty coverage by building section
Identify the right issuer and written agreement before authorizing new work.
Portfolio review
Resolve roof questions that affect a property purchase, phased investment or multi-building approval.
Portfolio review packet (PDF)Resolve roof discrepancies before an acquisition review
Give the acquisitions team a short list of roof claims that could change its decision and the evidence needed to settle each one.
Record roof-related exceptions at a tenant handback
Build a dated record of rooftop changes and unresolved questions while the outgoing tenant and building team are both available.
Match a portfolio roof award to the right purchase orders
Give accounting and field teams a common reference when one roof award covers buildings owned or billed separately.
Map a roof shutdown that affects more than one building
Find the people and operations downstream of a proposed interruption before anyone agrees to a work window.
Will the roof proposal still be valid when you can issue the award?
Line up the offer’s validity date with the owner’s approval, purchasing and notice dates before relying on the quoted scope.
What changes if one building drops out of a roof award?
Request a written deferral option so the portfolio team can see what remains executable when one property is held back.
Roof handoff
Give the next facility team a record of repairs, materials, service visits and open questions.
Roof handoff packet (PDF)What changed on the roof during HVAC service?
Reconcile the mechanical work order with the roof record before closing the service visit.
Which coating batch was applied to each roof section?
Connect delivery and application records to the section actually coated.
How can inspectors repeat the same roof photo next year?
Create a short shot list that a different inspector can reproduce.
What records belong with a commercial roof warranty claim?
Assemble the information the named issuer needs to locate the roof and review the reported issue.
What should the incoming facility manager know about this roof?
Transfer ownership of roof records and open actions when a building changes hands internally.
What happened at the repaired location after the next rain?
Compare an occupied-space observation with the original repair record after a weather event.