Which coating batch was applied to each roof section?

Connect delivery and application records to the section actually coated.

How to use this worksheet

Ask the applicator for a marked roof plan and a daily record linking each product, color and batch or lot to its application area. A delivery ticket tells you what arrived, while the crew’s application record identifies where the material went. Where batches changed within a section, ask the crew to mark the transition or state that the precise boundary is unknown. File label images and any retained sample identifiers with those records. Ask the project lead to reconcile leftover and unopened material separately at handover.

Example

Two drums share one delivery ticket. A dated drawing shows the first drum covered the west wing and the second began partway across the loading canopy.

Your roof record

Type your notes, then print or save a PDF before leaving this page. Anyone opening a shared link gets a blank worksheet.

Request an assessment

Tell us where the property is and what needs attention. Roof inspections and estimates are free, with measurements, photos, a video walkthrough and drone views included. You’ll receive a request reference number.

Add address, timing or project details (optional)