Which coating batch was applied to each roof section?
Connect delivery and application records to the section actually coated.
How to use this worksheet
Ask the applicator for a marked roof plan and a daily record linking each product, color and batch or lot to its application area. A delivery ticket tells you what arrived, while the crew’s application record identifies where the material went. Where batches changed within a section, ask the crew to mark the transition or state that the precise boundary is unknown. File label images and any retained sample identifiers with those records. Ask the project lead to reconcile leftover and unopened material separately at handover.
Example
Two drums share one delivery ticket. A dated drawing shows the first drum covered the west wing and the second began partway across the loading canopy.
Your roof record
Type your notes, then print or save a PDF before leaving this page. Anyone opening a shared link gets a blank worksheet.