Read a roof moisture map before budgeting tear-out
Separate survey indications, field confirmations and measured repair quantities.
How to use this worksheet
Request the interpreted survey map and have the assessor label where each follow-up observation was made. For every outlined area, record the survey indication, the confirmation method used by the qualified assessor and the extent the assessor considers supported. Ask for the assembly and layers involved, plus any areas that could not be evaluated. Request separate quantities for confirmed work and unresolved allowances. If the repair boundary will be established after opening, agree who will mark and approve changes to the working map.
Example
A thermal image flags two zones near a loading bay. The follow-up report confirms wet insulation at one location and leaves the other unresolved. Give them separate budget entries.