What changes if one building drops out of a roof award?

Request a written deferral option so the portfolio team can see what remains executable when one property is held back.

How to use this worksheet

Start with the complete proposed sequence and name the one property most likely to miss its release date. Ask the contractor to describe the scope, shared resources and completion sequence for the buildings that would proceed without it. Request a separately identified return option for the held property, including any timing assumptions that would require a fresh quote. The approval team can then compare a complete award with a documented partial release using the same underlying scope.

Example

Three roofs share a lifting arrangement. A tenant approval may delay Building B. The owner requests one option to complete A and C together and another for returning to B, with each lift allowance shown only in the option where it would be used.

Your roof record

Type your notes, then print or save a PDF before leaving this page. Anyone opening a shared link gets a blank worksheet.

Request an assessment

Tell us where the property is and what needs attention. Roof inspections and estimates are free, with measurements, photos, a video walkthrough and drone views included. You’ll receive a request reference number.

Add address, timing or project details (optional)