Review an adhesion test report before approving coating

Tie every test result to the surface, preparation and proposed system it represents.

How to use this worksheet

Ask for a marked roof plan and a separate entry for each test patch. Each entry should identify the existing surface, preparation, proposed products, test date, observations and the criterion the reviewer used. Request photographs showing the patch location and the surface after testing. Have the reviewer identify what separated, which sections the result can represent and what still requires a new test or a manufacturer decision. Attach that interpretation to the estimate so a successful patch on one surface cannot silently stand in for a different detail.

Example

A test on the main field performed as expected. A band of old repair material along the parapet was prepared differently, so the facilities manager requests its own disposition.

Your roof record

Type your notes, then print or save a PDF before leaving this page. Anyone opening a shared link gets a blank worksheet.

Source material

Request an assessment

Tell us where the property is and what needs attention. Roof inspections and estimates are free, with measurements, photos, a video walkthrough and drone views included. You’ll receive a request reference number.

Add address, timing or project details (optional)