What changed on the roof during HVAC service?
Reconcile the mechanical work order with the roof record before closing the service visit.
How to use this worksheet
Start with the equipment tag and the roof section shown on your facility plan. Ask the mechanical contractor to identify what changed around that unit, including lines added or removed and any existing flashing or supports their work disturbed. Request a dated overview and detail photos from the contractor who had authorized access. Give those records to the roofing contact for review. Record who will address any outstanding roof detail and what confirmation the facility needs before closing the mechanical ticket.
Example
A replacement condenser uses a new line route. The mechanical ticket identifies the new route but says nothing about the old opening, so the manager assigns a roofing follow-up against that ticket.