Commercial roof bid clarification register
Bring two actual proposals to the same review. Compare their commitments, check how a wet-area discovery would change each price, and record what the owner still needs in writing.
Your entries stay on this page. Print or save a PDF before closing, refreshing or opening another page.
Compare the written commitments
At each row, record the proposal page, drawing or dated addendum that supports each answer. Mark an omitted item “open” so the approval team can assign it.
Roof boundaries and base scope
Identify the roof sections, measured area and detail counts covered by both bids. Mark exclusions on the same roof plan.
Existing conditions and testing
Reference the moisture map, sample or adhesion-test record used to price the roof. Write down who verifies the location and extent of removal.
Occupied-building costs
Compare access hours, dock closures, tenant notices and protective measures. Record who pays for planned after-hours access and remobilization.
Manufacturer and workmanship terms
Identify the exact sample, issuer and revision for each offered warranty. Record covered labor, required inspections, exclusions and owner maintenance duties.
Closeout and future recoating
Record the promised photos, application records and issued warranty documents. Identify who receives them and what inspection or compatibility checks a future recoat requires.
Check a wet-area alternate
Use the same hypothetical total wet area for both proposals. Extra cost equals the area above the included quantity multiplied by the written unit price. Confirm both prices cover the same removal, disposal and reinstatement. Enter zero only when documented. A lump sum or different assembly needs a written clarification.
Bid A
Bid B
Record the decision for approval
For each unresolved difference, name the person who can answer it and record the addendum before relying on the revised price.
Compare total proposal cost · Read the coating bid and warranty guide