Commercial roofing

Make a brief for my owner

Put one comparable Diamond job, your roof concern and the decision you need on a single page.

Diamond Roof Restorations
Diamond Roof Restorations

Securing Your Shelter

Roof assessment approval brief

What is happening at our building?

Water has been reported inside more than once. The source of entry needs to be traced. Plan the assessment around continued building use.

What did Diamond do on a similar job?

White metal roof with rows of skylights at National Tire Warehouse in Pooler
The field photograph shows the coated R-panel roof and rows of skylights.

National Tire Warehouse · Pooler, GA

Diamond and Diversified Roofing Solutions restored the R-panel metal roof with Uniflex acrylic and replaced 220 skylights. Ask bidders to list the field coating and skylight work separately so you can compare the same scope.

View the project record View the project record

What still needs an on-site assessment?

Identify the roof assembly, trace reported water entry and inspect seams, openings and prior repairs. Diamond and the building contact can then discuss access windows and a written scope for the areas inspected.

What are we authorizing?

Approve contacting Diamond to arrange a roof assessment. Confirm visit details directly with Diamond. Any construction scope and price need separate written approval.

Request an assessment 912-207-6273

Request an assessment · diamondroofs.net/estimate · 912-207-6273

What decision should the board make?

Illustrative agenda item · Building A, west loading bay. Approve one targeted repair and a capped investigation. The proposed roof map identifies B-04 at the equipment curb, an 8-foot detail, and W-02 at the adjoining bay, where the wet-area boundary remains open.

Building A · Section BNWest dockEast dock · availableB-04 · curbW-02 · verify
Sample plan, schematic. Filled marker B-04 locates a defined repair. Dashed marker W-02 identifies the adjoining investigation area. Its boundary and quantity await confirmation.
Motion and limit
Authorize the B-04 repair and up to 100 sq ft of verified wet-area removal at the bid’s written unit rate. Additional scope returns to the owner’s named approver before covering the opening.
Alternative and operating impact
The owner may authorize investigation first and defer field restoration pending the results. Keep the east dock available while the west dock is reserved for the agreed access window.
Who acts next
Facilities confirms the work window and notice. The roofer maps actual quantities and changes. The board records the approved scope, cap and date in the minutes.

For a public procurement, follow the solicitation’s authorized contacts, addenda, bid format and deadlines.

Request an assessment

Your free roof inspection includes measurements, photos, a video walkthrough and drone views.

Add photos, address or timing (optional)